Get Started Today! 800-239-5950

Author Archives: Dan

8″ Waterline Beneath Slab Cabin Run

Posted on

In early August DTD completed a HDD crossing of Slab Cabin Run in State College, Pennsylvania. Slab Cabin Run is…


Pecos River Crossing

Posted on

DTD has completed a pullback of 1,000 feet of 16” Steel beneath the Pecos River near the New Mexico/Texas border….


Pipeline Construction Picking up

Posted on

The cold winter and wet spring seemed to stall the early season pipeline construction. Its not likely weather actually slowed…


Navy tweet about DTD’s Horizontal SVE Wells in Hawaii

Posted on

DTD has entered the Twittersphere. Well, not really. While we do not officially tweet (yet), some of our clients do….


“Inflection Points” Newsletter Archive

Posted on

DTD maintains an archive of our “Inflection Points” Newsletter. They can be found by clicking on the “Resources” tab, and…


Cold Weather Pipeline Installation

Posted on

Just because the “Polar Vortex” has descended over the lower 48 it doesn’t mean pipeline installation has to stop. DTD…


20-inch Pipeline and New Support Equipment

Posted on

DTD continues its directional drilling for pipeline installation in the upper mid-west, having recently completed the installation of four bores…


Midwest River Crossing – 830′ of 16″ steel

Posted on

Directed Technologies Drilling recently completed a river crossing and pullback of 16″ pipeline in the Midwest. The pipeline was necessary…


Revisiting a former post: DTD uses air hammer to install water supply well in Colorado landslide deposit

Posted on

A small town on the western slope in Colorado was in need of improvements to its near-surface water supply.  A…


Horizontal Remediation Wells on Both Coasts

Posted on

This week (May 20-24) DTD is completing horizontal remediation wells in Maryland and California. Both sites require blind wells under…