Get Started Today! 800-239-5950

Author Archives: Luke

East Coast AFB – 500′ Horizontal Sparge Well

Posted on

DTD ended the year 2015 with the installation of a 500 foot long horizontal remediation well at an east coast…


Horizontal Sparge wells at an East Coast AFB

Posted on

DTD has recently completed the installation of two horizontal remediation wells at an east coast US Air Force Base.  The…


Blind Injection Wells Installed Using Knock Off Tech

Posted on

Often scenarios arise where clients call upon directional drilling to place well screen in areas otherwise inaccessible to vertical drillers. …


DTD Returns to Indiana

Posted on

After finishing up two Indiana projects in October, DTD was called back by the same client to install three SVE…


Back-to-Back HDD Projects in Indiana

Posted on

A big advantage of directional drilling is the ability to set up the drilling equipment some distance away from a…


Blind SVE Wells in the Mid-West

Posted on

DTD recently completed the installation of four single-ended, or “blind”, Soil Vapor Extraction (SVE) horizontal wells at a Superfund site…


HDD Soil Samples from Beneath Occupied Residences

Posted on

DTD has finished a 2 week soil sampling project at a Superfund site on the west coast. A total of…


Short Gathering Line – 310′ of 4″

Posted on

DTD’s Vermeer D36x50DR dual rod rig was put back to work near Pittsburgh, Pennsylvania with a 310’ crossing under a…


SVE wells installed in Sacramento

Posted on

DTD recently completed the installation of two single-ended, or “blind,” Soil Vapor Extraction (SVE) wells under a former dry cleaning…


Meshoppen Creek Crossing – 1415′ of 10″

Posted on

With DTD’s reputation in successful completion of difficult pipeline crossings, we were once again asked to return to Northern Pennsylvania…