Get Started Today! 800-239-5950

Author Archives: Mike

Petroleum Cleanup under Busy LA Intersection

Posted on

In March 2016, DTD completed three directionally drilled horizontal Soil Vapor Extraction wells at depths up to 55 feet beneath a…


December 2015 – Blind Well Installation Record

Posted on

We’ve been very diligent in the keeping the content of Inflection Points informative and non-commercial. However, in this issue we…


November 2015 – Horizontal Wells for Remediation

Posted on

Horizontal Wells for Remediation It’s been several months since the last issue of Inflection Points; we have had a busy…


June 2015 – Waste Management on HDD Projects

Posted on

Waste Management One of the most frequent questions from consultants and owners when discussing a horizontal drilling project (or any…


DTD presenting at NV H2O Resources – Mar. 1-3

Posted on

David Bardsley will be presenting two posters and an oral presentation at the Nevada Water Resources 2016 Annual Conference.  The…


Visit DTD at Emerging Contamination Conference, Denver, Mar. 1-2

Posted on

Visit DTD technical staff at the Emerging Contaminants Summit being held at the Westin Westminster Hotel, Westminster, CO, March 1…


Small Construction Footprint at DOD Air Station

Posted on

Often when environmental consultants consider horizontal wells, they think of the large drill rigs and the many pieces of support…


SST Guidance System Powers Up DTD Project

Posted on

With two months of daily use on a DTD project in the southeast, DTD has embraced the use of the…


Not Just for Remediation – HDD does water supply, too

Posted on

DTD continues to assist our clients in assessing the use of horizontal directional drilling to solve challenging water supply issues….


DTD Kicks Off Injection Well Project at Legacy DOE Site

Posted on

DTD is kicking off a project in the southeast to install several horizontal injection wells beneath a manufacturing facility once…